Footpath Maintenance
Footpath maintenance work
On the Amble marshals walks two maintenance projects were identified. The bridge at Ornamental Reservoir needed some repair work and the stile where the path leaves the road at Belmont was very unstable and quite dangerous.
A small team led by John set off to tackle this work today.
First it was the bridge
As it was
Work gets underway by removing all the rotten timber. Watch the holes John!
All the rotten timber is then replaced
Job well done
Then it was covering with mesh
Job well done
Finally it was to the style which needed major surgery !